Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | CHINA |
---|---|
Brand Name: | unitedwin |
Model Number: | UW |
Minimum Order Quantity: | 1 set |
Price: | USD |
Delivery Time: | 3 months |
Payment Terms: | L/C, T/T |
Supply Ability: | 3 sets/ month |
Name: | Artificial Lawn Tufting Machine | Gauge: | 5/8 Inch |
---|---|---|---|
Power Of The Main Motor: | 18.5kw*2(5m) | Machine Speed: | 400-600rpm |
Pile Height: | 20-70mm | Condition: | New |
Warranty: | 1 Year | Origin: | China |
Highlight: | Artificial Grass Lawn Tufting Machine,600rpm Artificial Grass Tufting Machine,70mm Artificial Grass Production Line |
Artificial Lawn Tufting Machine Artificial Grass Production Line
Description:
Artificial turf is the grass silk drawn from pa, pp and pe materials, and the grass silk and pp mesh cloth are sewn together by a tufting machine. Artificial turf can be used in sports venues such as runways, football fields, tennis courts, baseball fields, hockey fields, gate courts, golf courses, basketball courts, volleyball courts, badminton courts and softball fields. Artificial turf plays a role in greening.
The tufting machine is the main equipment for producing artificial turf. The tufting machine sews the grass silk on the base fabric at high speed through the up and down reciprocating motion of the tufting needle. The principle of the tufting machine is similar to that of the sewing machine.
Technical Parameters:
Gauge | 5/32 inch | 5/16 inch | 3/16 inch | 3/8 inch | 5/8 inch | 1/4 inch |
Power of the main motori |
7.5kw×2(2m) 15kw×2 (4m) 18.5kw×2(5m) |
|||||
Pile height | 7-18mm | 20-60mm | 8-40mm | 20-70mm | 8-45mm | |
Mechanical speed | 400-600 rpm |
Machine details:
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. What is your terms of payment ?
30% T/T in advance ,balance before shipment.