Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | CHINA |
---|---|
Brand Name: | UW |
Model Number: | UW-90x33-700/1100 |
Minimum Order Quantity: | 1 set |
Price: | USD |
Payment Terms: | L/C, T/T |
Name: | Double-Die Stretching Production Line | Max.Extrusion Volume: | 170kg/H |
---|---|---|---|
Screw Dia: | 90mm | Ratio Of L/D: | 33:1 |
Rotate Speed Of Screw: | 20-120r/Min | Length Of Mold Lip: | 700/1100mm |
Line Speed: | 230m/Min | Flat Yarn Fibre Scope: | 60-230tex |
Condition: | New | Warranty: | 1 Year |
Origin: | China | Drawing Ratio: | 4-10 |
Winder: | 136 Spindles | ||
Highlight: | PP HDPE Plastic Tape Extrusion Line,170 kg/H Tape Extrusion Line,1100 mm Tape Extrusion Line |
PP HDPE Plastic Extrusion Flat Film Double-die Stretching Production Line For Woven Sack/Chemical Bag/Cement bag/Jumbo Bag/Geo Textile/Tarpaulin
Descripition:
UW-S series plastic extrusion flat film double-die stretching line is specially designed for PP and HDPE with high quality and excellent performance.
Perfect tape quality Lowest consumption Best economic benefit
Available: woven sack, chemical bag, foods bag, cement bag, leno bag, jumbo bag, geo textile, tarpaulin.
Technical Parameters:
Item | UW-90×33-700/1100 | UW-100×33-900/1300 | UW-110×33-1100/1350 | UW-120×33-1200/1500 |
Max.extrusion volume | 170kg/h | 250 kg/h | 330kg/h | 400 kg/h |
Screw Dia | 90mm | 100mm | 110mm | 120mm |
Ratio of L/D | 33:1 | 33:1 | 33:1 | 33:1 |
Rotate speed of screw | 20-120r/min | |||
Length of mold lip | 700/1100mm | 900/1330mm | 1000/1350mm | 1200/1500mm |
Line speed | 230m/min | |||
Flat yarn fibre scope | 60-230tex | |||
Drawing ratio | 4-10 | |||
Winder | 136 Spindles | 184 Spindles | 212 Spindles | 240 Spindles |
Applications:
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. What is your terms of payment ?
30% T/T in advance ,balance before shipment.