Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | CHINA |
---|---|
Brand Name: | unitedwin |
Model Number: | SJPL-Z90×33-SM900 |
Minimum Order Quantity: | 1 set |
Price: | USD |
Delivery Time: | 3 months |
Payment Terms: | L/C, T/T |
Supply Ability: | 3 sets/ month |
Max.Extrusion: | 280kg/h | Screw Dia: | Φ90mm |
---|---|---|---|
Scew RPM.: | 20-100r/min | T Die Head Lip Length: | 900mm |
Power: | 320KW | Weight: | 30T |
Size: | 40000×3500×2600 | Automatic Grade: | Automatic |
Certification: | CE | Plastic Processed: | PP |
Highlight: | hdpe woven sack bag making machine,PP Woven Sack Bag Making Machine 500kg H,pp woven bag manufacturing machinery |
PP Tape extrusion line Woven Sacks Machinery Tape Extrusion Line Process SJPL-Z90×33-SM900
Description:
PP and HDPE flat yarn.Higher flat yarn quality, lower consumption and better economic benefits
Application: woven bag, chemical bag, grain bag, cement bag, mesh bag, container bag, geotextile, tarpaulin
Specifications:
Item | SJPL-Z90×33-SM900 | SJPL-Z110×33-SM1100 | SJPL-Z120×33-SM1300 | SJPL-Z130×33-SM1500 |
Max.Extrusion | 280kg/h | 320kg/h | 420kg/h | 500kg/h |
Screw Dia. | Φ90mm | Φ110mm | Φ120mm | Φ130mm |
scew RPM. | 20-100r/min | 20-100r/min | 20-100r/min | 20-100r/min |
T Die Head Lip length | 900mm | 1100mm | 1300mm | 1500mm |
SJJ Winder speed | 280m/min | 280m/min | 280m/min | 280m/min |
SHW Winder speed | 400m/min | 400m/min | 400m/min | 400m/min |
Tex.Range | 60-200tex | 60-200tex | 60-200tex | 60-200tex |
Winder No.S | 280 | 340 | 410 | 480 |
Power | 320KW | 350KW | 400KW | 450KW |
Size | 40000×3500×2600 | 42000×3500×2600 | 45000×3500×2600 | 48000×3500×2600 |
Weight | 30T | 35T | 40T |
48T |
Company information:
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. What is your terms of payment ?
30% T/T in advance ,balance before shipment.