Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | CHINA |
---|---|
Brand Name: | United Win |
Model Number: | UW-4 |
Minimum Order Quantity: | 1 set |
Price: | USD |
Packaging Details: | Wooden case |
Delivery Time: | 3 month |
Payment Terms: | T/T, L/C |
Supply Ability: | 3sets/month |
Name: | Circular Loom Machine | Max. Bobbin Diameter: | 100mm |
---|---|---|---|
Number Of Warp Yarns: | 512pcs | Normal Rating Of Main Motor: | 2.2kw |
Lift Motor Power: | 22N | Winding Motor Power: | 10kgs Torque Motor |
Total Power: | 3Kw | Installed Size (mm): | 10500* 2400* 3200 |
Weight: | 2T | Warranty: | 1 Year |
Place Of Origin: | China | ||
Highlight: | Four Shuttle Circular Loom Machine,Woven Bag Circular Loom Machine,Woven Bag circular weaving machine |
PP/PE Woven Fabric Roll Cement Rice Bag Four Shuttle Circular Circle Loom Weaving Making Machine
Descripition:
This serious of four shuttle circular loom is latest plane cam struture,weaving the cylinder or flat cloth with PP and HDPE flat yarns.
• Latest plane cam structure -adopt idler wheel from shuttle, non-lubrication.
• The brown belt made of high-strength and high-toughness material, with brown silk, runs smoothly and has low noise.
• Complete weft and weft automatic detection system.
• Man-machine interface centralized control, easy to operate.
Specifications:
Working width,double flat | 60-750mm |
Number of shuttles per machine | 4 |
weft density | 10-24pcs/10cm |
Speed | 0-120RPM |
Warp feeding | Motor |
Inner diameter of Bobbin | 38mm |
Bobbin length | 230mm |
Max. bobbin diameter | 100mm |
Number of Warp yarns | 512pcs |
Normal rating of main motor | 2.2kw |
lift motor power | 22N |
winding motor power | 10kgs Torque motor |
Total power | 3Kw |
Installed size (mm) | 10500* 2400* 3200 |
weight | 2T |
Machine Photo:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
4. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
5. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 150USD/day for each person.
6. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time.
Our engineers will take a solution video according your description.