Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | CHINA |
---|---|
Brand Name: | United Win |
Model Number: | UW-850X6H |
Minimum Order Quantity: | 1 set |
Price: | USD |
Packaging Details: | Wooden case |
Delivery Time: | 3 month |
Payment Terms: | T/T, L/C |
Supply Ability: | 3sets/month |
Name: | Circular Loom Machine | Number Of Shuttles: | 6 |
---|---|---|---|
Folding Width Of Cloth(mm): | 300-850 | Number Of Warp: | 720pcs |
Weft Density: | 8-16(pcs/inch) | Max. Speed: | 150-180rpm/min |
Power Of Main Motor: | 3kw | Certification: | ISO/ CE |
Max.weft Bobbin Diameter: | Ф 115 | Overall Dimension(L×W×H): | 10500×2800×2920mm |
Weight (about): | 2500kg | Condition: | New |
Processing Type: | Automatic | Warranty: | 1 Year |
High Light: | Circular weaving pp loom machine,6 Shuttle Circular weaving machine,6 Shuttle pp loom machine |
SBY-850X6H Six Shuttle Circular Loom PP Woven Bags Making Machine
Features:
1. With the scroll transmission by little cam and swing-arm wheel, the machine runs easily and stably, non-lubrication.
2. Adopt the latest energy saving synchronous motor and the intelligent micro-computer controling system can be installed if
required.It can adjsut the weft density and compensate the weft density in case of weft-braking , which can improve the evenness
of woven fabrics.
3. With the detector for warp-breaking, weft-breaking and weft-ending, the sensibility for automatic stop becomes reliable.
Specifications:
Item | UW-650×4 | UW-850X6H | UW-1350×6 | UW-2200×6 | UW-2250×8 |
Number of shuttles(pcs) | 4 | 6 | 6 | 6 | 8 |
Folding width of cloth(mm) | 150-650 | 300-850 | 900-1350 | 1500-2200 | 1750-2250 |
Number of warp | 576 pcs | 720pcs | 1200pcs | 2880pcs | 2880pcs |
Weft density | 8-16(pcs/inch) | ||||
Max. speed(r/min) | 160 | 150-180 | 110 | 80 | 70 |
Power of main motor | 2.KW | 3kw | 5.5 KW | 7.5kw | 11kw |
Max.weft Bobbin diameter | Ф 100 | Ф 115 | Ф 90 | ||
Overall dimension(L×W×H) | 8500×2500×2900 | 10500×2800×2920 | 10850×3000×3500 | 16480×3600×4580 | 16480×3600×4580 |
Weight (about) | 2000kg | 2500kg | 4200kg | 8000kg | 9000kg |
Machine Photo:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time.
Our engineers will take a solution video according your description.