Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | CHINA |
---|---|
Brand Name: | unitedwin |
Model Number: | UW |
Minimum Order Quantity: | 1 set |
Price: | USD |
Delivery Time: | 3 months |
Supply Ability: | 3 sets/ month |
Name: | Artificial Turf Grass Production Line | Application: | PP,PE |
---|---|---|---|
Screw Design: | Single-screw | Screw L/D Ratio: | 33:1 |
Voltage: | 380V, 50Hz | Scew RPM.: | 20-100r/min |
SJJ Winder Speed: | 280m/min | SHW Winder Speed: | 400m/min |
Tex.Range: | 60-200tex | Weight: | 30T |
Warranty: | 1 Year | Place Of Origin: | China |
Highlight: | Polyethylene Artificial Grass Making equipment,PP Artificial Grass Making equipment,Polyethylene Artificial Grass Making machine |
PP PE Polyethylene Artificial Turf Grass Production Line Manufacturer In China
Performance Characteristics:
Artificial turf grass production line can produce different size of PP,HDPE virgin or recycled monofilament,fishing yarn, which is widely used in finishing net,plastic twine,plastic rope,safety net.
Main Technical Parameters:
Item | SJPL-D/S90×33-1000 | SJPL-D/S100×33-1100 | SJPL-D/S110×33-1300 | SJPL-D/S120×33-1500 |
Max.Extrusion | 280kg/h | 320kg/h | 420kg/h | 500kg/h |
Screw Dia. | Φ90mm | Φ110mm | Φ120mm | Φ130mm |
Scew RPM. | 20-100r/min | 20-100r/min | 20-100r/min | 20-100r/min |
T Die Head Lip length | 900mm | 1100mm | 1300mm | 1500mm |
SJJ Winder speed | 280m/min | 280m/min | 280m/min | 280m/min |
SHW Winder speed | 400m/min | 400m/min | 400m/min | 400m/min |
Tex.Range | 60-200tex | 60-200tex | 60-200tex | 60-200tex |
Winder No.S | 280 | 340 | 410 | 480 |
Power | 320KW | 350KW | 400KW | 450KW |
Size | 40000×3500×2600 | 42000×3500×2600 | 45000×3500×2600 | 48000×3500×2600 |
Weight | 30T | 35T | 40T | 48T |
Applications:
Company information
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. What is your terms of payment ?
30% T/T in advance ,balance before shipment.