Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | CHINA |
---|---|
Brand Name: | unitedwin |
Model Number: | SBY-850x6S |
Minimum Order Quantity: | 1 set |
Price: | USD |
Packaging Details: | Wooden case |
Delivery Time: | 3 months |
Payment Terms: | L/C, T/T |
Supply Ability: | 5 sets/ month |
Name: | Circular Loom Machine | NO. Of Shuttle: | 6 Shuttles |
---|---|---|---|
Nolding Width Of Cloth: | 300-850mm | Number Of Warp: | 720 |
Weft Densith: | 20-75picks/100mm | Running Speed Of Main Motor: | 135-150r/min |
Power Of Main Motor: | 3kw | Max. Weft Bobbin Diameter: | 1155mm |
Specification Of Bobbin(ID×L): | 28-38x230mm | Weight Of Machine(about): | 2000kg |
Warranty: | 1 Year | ||
Highlight: | Six Shuttle Circular Loom Machine,Sack Bags Circular Loom Machine,Six Shuttle Loom Making Machine |
SBY-850x6S Six Shuttle Circular Loom PP Woven Sack Making Machine
Description:
The circular loom machine is used for weaving PP/PE flat yarn to be woven fabric in roll. We can make all type Circular Loom such as 4-shuttle Circular Loom, 6-Shuttle Circular Loom, 8-shuttle Circular Loom, and 10shuttle Circular Loom. Circular Loom can make PP woven fabric for cement bag, rice bag, wheat Woven Bag , Jumbo/Container/FIBC Bags, sugar Woven Bags.
Main technical Datas:
ltem | SBY-850x6S |
Number of shuttles(pcs) | 6 |
Nolding width of cloth | 300~850mm |
Number of warp | 720 |
Weft densith | 20-75picks/100mm |
Running speed of main motor | 135-150r/min |
Power of main motor | 3kw |
Specification of bobbin(ID×L) | 28-38x230mm |
Max. weft bobbin diameter | 1155mm |
Overall dimension(L×W×H) | 10500x2800x2920mm |
Weight of machine(about) | 2000kg |
Machine Details:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 150USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date