Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | CHINA |
---|---|
Brand Name: | unitedwin |
Model Number: | uw |
Minimum Order Quantity: | 1 set |
Price: | USD |
Delivery Time: | 3 months |
Payment Terms: | L/C, T/T |
Supply Ability: | 3 sets/ month |
Name: | PE-based Artificial Turf Monofilament Production Plastic Turf Monofilament Production Line | ^Large Extrusion Capacity: | 230kg/h |
---|---|---|---|
Screw Diameter: | 100mm | Length To Diameter Ratio: | 33:1 |
Screw Speed: | 20-120r/min | Die Lip Length: | 1300mm |
^Large Line Speed: | 120m/min | Tensile Ratio: | 4-10 |
Highlight: | 230kg/h artificial grass manufacturing machine,pe based artificial grass production line,artificial grass production line 230kg/h |
PE-based artificial turf monofilament production plastic turf monofilament production line
Performance Characteristics:
Simulation lawn is a high paving material for beautiful anti-slip and anti-fouling in hotels, restaurants, airports, entertainment venues and many other public places. Can be paved in a variety of foundation surface, fast and convenient, not affected by the climate, lasting color does not fade, any splicing easy to install, clean and dust-free.
Plastic lawn cleaning is simple, you can vacuum wash dust, flip a slight shaking to remove dust and sand, if the spoils bonded to the surface, available in water and detergent cleaning, and artificial turf cleaning pad without damage.
Main Technical Parameters:
Item | SJPL-C70×33-800 | SJPL-C90×33-1100 | SJPL-C100×33-1300 | SJPL-C110×33-1500 |
^Large extrusion capacity | 100kg/h | 170 kg/h | 230 kg/h | 280 kg/h |
Screw diameter | 70mm | 90mm | 100mm | 110mm |
Length to diameter ratio | 33:1 | 33:1 | 33:1 | 33:1 |
Screw speed | 20-120r/min | |||
Die lip length | 800mm | 1100mm | 1300mm | 1500mm |
^Large line speed | 120m/min | |||
Flat yarn fibre range | 60-900tex | |||
Tensile ratio | 4-10 | |||
Winding quantity | 42 | 60 | 72 | 80 |
Applications:
Company information:
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. What is your terms of payment ?
30% T/T in advance ,balance before shipment.