Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | CHINA |
---|---|
Brand Name: | United Win |
Model Number: | SBY-850X6S |
Minimum Order Quantity: | 1 set |
Price: | USD |
Packaging Details: | Wooden case |
Delivery Time: | 3 months |
Payment Terms: | L/C, T/T |
Supply Ability: | 8 sets/ month |
Name: | Circular Loom Machine | Model: | SBY-850X6S |
---|---|---|---|
Shuttle Qty.: | 6pcs | Max.fold Width: | 1400mm |
Max. Open Width: | 3000mm | Warp No.s: | 1820pcs |
Speed: | 5~80rpm | Main Power: | 7.5kw |
Place Of Origin: | Changzhou,China | Warranty: | 1 Year |
High Light: | 12 Shuttle Circular Weaving Machine,Circular Weaving Machine 51RPM,circular loom weaving machine |
Jumbo Ton Big Bag 6 Shuttle Circular Loom Weaving Machine
Description:
6-shuttle there are 6 shuttles installed with circular loom which able to weave simultaneously.
1. Lead-out speed of weft of current high-speed circular loom has reaches at about 5m/s, only weft of good-quality can fit it. In general 4m/s suits widely, for the case of same folded diameter and woof speed, production rate of 12 shuttles is 2 times of 6 shuttles, 1.5 times of 8 shuttles and 1.2 time of 10 shuttles respectively.
2.For fabrics, break of one weft thread means flaw, since it's difficult to avoid weft break completely, we have to reduce the affection of weft break, to increase shuttles is proven to be benefited , as follows:
shuttle (piece) | 4 | 6 | 8 | 10 | 12 |
loss of strength for break of one weft thread(%) | 25 | 16.7 | 12.5 | 10 | 8.3 |
As such loss of strength for 12 shuttles will be less then 10% while one weft breaks.
3. For same folded diameter, weaving speed and weft, time interval of weft change will be 2 times of 6 shuttles, 1.5 times of 8 shuttles and 1.2 time of 10 shuttles respectively, such that continuous running time of 12 shuttles will be longer than that of 6 shuttles,8 shuttles and 10 shuttles, if figured for 2-3 man operating two set of 12 shuttles circular loom, the efficiency and economy will be perfect.
Specifications:
No.s | Mould | Shuttle Qty.(pcs) | Max.fold width(mm) | Max. Open width(mm) | Warp no.s(pcs) | Speed(RPM) | Main power(KW) |
1 | UWCL-24/16000 | 24 | 8200 | 16400 | 8000 | 5~25 | 37 |
2 | UWCL-20/11000 | 20 | 5500 | 11000 | 5376 | 5~28 | 22 |
3 | UWCL-16/8300 | 16(12) | 4150 | 8300 | 4800 | 5~41 | 18.5 |
4 | UWCL-12/7800 | 12(14) | 3900 | 7800 | 4400 | 5~41 | 18.5 |
5 | UWCL-12/7200 | 12(14) | 3600 | 7200 | 3780 | 5~45 | 18.5 |
6 | UWCL-12/6500 | 12 | 3250 | 6500 | 3520 | 5~51 | 11/15 |
7 | UWCL-12/6000 | 12(10) | 3050 | 6100 | 3200 | 5~51 | 11/15 |
8 | UWCL-12/5400 | 12(10) | 2700 | 5400 | 2880 | 5~64 | 11/15 |
9 | UWCL-10/4800 | 10(8) | 2600 | 4600 | 2780 | 5~64 | 11 |
10 | UWCL-10/4400 | 10(8) | 2100 | 4500 | 2740 | 5~72 | 7.5/11 |
11 | UWCL-8/3500 | 8 | 1650 | 3600 | 1996 | 5~80 | 7.5 |
12 | UWCL-6/3200 | 6(8) | 1400 | 3000 | 1820 | 5~80 | 7.5 |
13 | UWCL-6/2700 | 6 | 1350 | 2700 | 1510 | 5~100 | 7.5 |
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
7. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time.Our engineers will take a solution video according your description.