Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | CHINA |
---|---|
Brand Name: | unitedwin |
Model Number: | UW |
Minimum Order Quantity: | 1 set |
Price: | USD |
Delivery Time: | 3 months |
Payment Terms: | L/C, T/T |
Supply Ability: | 3 sets/ month |
Name: | Artificial Grass Machine Artificial Grass Extrusion Line | Type: | SJPL-C70×33-800 |
---|---|---|---|
Max.extrusion: | 100kg/h | Screw Dia.: | 70mm |
L/D: | 33:1 | Screw RPM: | 20-120r/min |
T Die Lip Length: | 800mm | Max Line Speed: | 120m/min |
Tex Range: | 60-900tex | Draw Ratio: | 4-10 |
Winder No.S: | 42 | ||
Highlight: | monofilament artificial grass manufacturing machine,100kg/h fake grass machine,polyethylene fake grass machine |
Artificial Grass Machine Artificial Grass Extrusion Line PE Plastic lawn monofilament Lines
Product Description:
Plastic lawn monofilament lines, is the absorption of foreign advanced technologies in the digestive,high-quality turf filament production equipment design.
Suitable for PE, artificial turf filament as raw material production.
Main Technical Parameters:
Item | SJPL-C70×33-800 | SJPL-C90×33-1100 | SJPL-C100×33-1300 | SJPL-C110×33-1500 |
Large extrusion capacity | 100kg/h | 170 kg/h | 230 kg/h | 280 kg/h |
Screw diameter | 70mm | 90mm | 100mm | 110mm |
Length to diameter ratio | 33:1 | 33:1 | 33:1 | 33:1 |
Screw speed | 20-120r/min | |||
Die lip length | 800mm | 1100mm | 1300mm | 1500mm |
Large line speed | 120m/min | |||
Flat yarn fibre range | 60-900tex | |||
Tensile ratio | 4-10 | |||
Winding quantity | 42 | 60 | 72 | 80 |
Applications:
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. What is your terms of payment ?
30% T/T in advance ,balance before shipment.